1. Pre-arrangement to ensure the effect
When laying marble, the key link is to strictly screen the color, texture and surface flatness of the stone. Subsequently, it is necessary to accurately pre-lay according to the design drawings. During this process, each piece of stone needs to be carefully adjusted, and fine-tuned or replaced in time for possible size deviations, color differences and texture mismatches, until the overall layout is harmonious and unified, achieving the most ideal visual effect and laying quality.
2. The slurry needs to be full and uniform
Usually, cement mortar is used as a bonding material when laying marble. During the construction process, the carefully prepared cement mortar is evenly scraped onto the back of the marble. This step is crucial. It is necessary to ensure that the cement mortar covers the entire surface and has a uniform thickness. Cutting corners is strictly prohibited to ensure a strong bond between the marble and the base layer and the overall laying quality.